Timber-clad exterior of the Hoskins Building with views to the escarpment

case study

Photo: [Photographer]

Australian Passivhaus Association

Passivhaus in education

Hoskins Building

The Illawarra Grammar School, Wollongong NSW

Fresh air all day. Comfortable all year. Surrounded by timber and mountain views. This is what a school can feel like.

1stCLT Passivhaus school building in Australia, and first Passivhaus school in NSW
4 wksto put up the whole timber structure
600 tof CO₂ (approx.) stored in its timber

Awards and recognition

[Award][Body, year]
[Award][Body, year]
[Award][Body, year]
Australian Passivhaus Association01

Case study summary

A healthier school, built faster, with less carbon

The challenge

Create calm, light-filled, healthy classrooms with low running costs, using a construction method the builder had never tried.

The solution

A prefabricated timber structure designed and built to the Passivhaus Standard, with an airtight shell and fresh-air ventilation.

The result

Australia’s first CLT Passivhaus school building, and the first Passivhaus school in NSW.

0.15

ACH airtightness result

~4 wks

to erect the timber shell

~600 t

CO₂ stored in the timber

[ ]%

energy saving vs typical school

Highlights

Energy

Very low heating and cooling demand

Health

Fresh, filtered air and steady temperatures

Materials

Mass timber in place of concrete and steel

Construction

Prefabricated, fast and precise on site

Education

A building that teaches sustainability

Key lesson: start early with an experienced team, and Passivhaus is practical and achievable for any school.

Hoskins Building · 02
Classroom window framing trees outside

the story

Introduction

A school that teaches by example

Schools shape how young people see the world. The buildings they learn in shape that view too.

When The Illawarra Grammar School planned the Hoskins Building, the goal was clear: calm, light-filled, naturally ventilated classrooms that support student wellbeing and engagement, with a strong connection to the landscape around Wollongong.

The architects proposed a prefabricated cross-laminated timber (CLT) structure. Passivhaus was the logical next step. CLT is naturally airtight and performs well thermally, which makes it an ideal partner for the world’s most rigorous building performance standard.

The school saw the benefits quickly: lower energy use, better comfort and wellbeing for students and staff, and the chance to lead in sustainable education design.

The building opened in May 2026. It is Australia’s first CLT school building delivered to the Passivhaus Standard, and the first Passivhaus school in New South Wales.

This is the story of how it was done, and what other schools can learn from it.

What is CLT?

Layers of timber glued at right angles into large, strong panels, made in a factory and assembled on site like a kit.

What is Passivhaus?

An international standard for comfortable, healthy, low-energy buildings. More on page 5.

We acknowledge the Dharawal people, the Traditional Custodians of the land on which the Hoskins Building stands, and pay our respects to Elders past and present. [Confirm wording with the school]

Hoskins Building · 03Australian Passivhaus Association
Sunlit classroom with exposed CLT walls and views to the trees

learning

A better place to learn

Exposed timber, daylight and clean air make a space people genuinely enjoy. That supports concentration, learning and wellbeing for students and staff.

Fresh air, all day

A constant supply of filtered air keeps every classroom fresh.

Comfortable all year

Steady temperatures through summer and winter help students focus.

Connected to nature

Natural light, warm timber and views to Mt Keira and Mt Kembla.

School quote 1 · via architect

[What the new building means for students and teachers.]
[Name, Title], The Illawarra Grammar School
Hoskins Building · 04  |  Photo: [Photographer] Australian Passivhaus Association

passivhaus

The standard explained

What is Passivhaus?

Passivhaus is an international building standard that puts comfort, health and energy efficiency first. Every building is designed and modelled to strict targets, tested on site, then independently certified.

Certified Passivhaus buildings can use as much as 90% less heating and cooling energy than conventional buildings. It works for any building type, and it rests on five simple principles.

1

Continuous insulation

The building is wrapped like a thermos. Rooms stay at a steady temperature with no cold corners.

2

Airtight construction

No draughts or hidden leaks. The Hoskins Building tested at an exceptional 0.15 ACH.

3

High-performance windows

Big views and daylight without losing heat in winter or gaining it in summer.

4

No thermal bridges

Careful detailing stops heat escaping through the structure and helps prevent condensation and mould.

5

Heat-recovery ventilation

Fresh, filtered air flows in all day, while the warmth or coolness stays inside.

For schools, that means healthier air, steadier comfort and lower running costs, year after year.

Students and staff spend most of their day indoors. Passivhaus makes that time healthier and more comfortable, while cutting the energy bills schools pay for decades to come.

Hoskins Building · 05Australian Passivhaus Association
Timber-lined corridor with yellow floor and clerestory windows

Photo needed

The CLT structure going up on site

building

Built in four weeks

The timber panels were made in a factory and arrived ready to install. Walls, floors, roof and stair were up and weatherproof in about four weeks.

The builder had never done a Passivhaus project. They embraced it, sealing every service penetration and protecting the airtight layer throughout construction.

Because the timber was exposed, services and ductwork fixed straight to it. Follow-on trades could start almost as soon as the shell was closed.

0.15 air changes per hour in the airtightness test, two to four times tighter than the architect’s other timber Passivhaus projects

Head contractor quote

“[What it was like building to Passivhaus for the first time.]”
[Name, Title], [Head contractor]
Hoskins Building · 06  |  Photo: [Photographer] Australian Passivhaus Association

interview

In conversation

Ask the architect

Knut Menden, betti und knut architecture [confirm title]

Why did the school choose Passivhaus?

“We first proposed a prefabricated CLT structure, and Passivhaus was the logical next step. CLT naturally lends itself to high levels of airtightness and thermal performance. The school recognised the benefits: lower energy use, better comfort and wellbeing, and the chance to show leadership in sustainable education design.”

Was it harder to build than a normal school?

“It was more straightforward than many people expect. The CLT arrived with great precision and inherent airtightness, so only the panel joints needed sealing. The whole shell was up and weatherproof in about four weeks. Services, ceilings and ductwork fixed straight to the timber, with none of the extra preparation concrete or lightweight framing needs. That cannot be overstated.”

What did the 0.15 ACH result teach you?

“Most of our Passivhaus work has been homes, so we were pleasantly surprised at this scale. Our other CLT Passivhaus projects usually achieve 0.38 to 0.60 ACH. The larger air volume helps, but it also reflects the care taken on site, by a contractor delivering their first Passivhaus project.”

What would you tell a school that thinks Passivhaus is too hard?

“Work with an architect who has Passivhaus experience and build the principles in from the outset. Considered early, Passivhaus is practical and achievable, with significant long-term benefits for performance and wellbeing.”

Photo needed

Portrait of the architect

Photo needed

Architect and builder on site

Photo needed

Project team together

Hoskins Building · 07  |  Answers edited for length, architect to approveAustralian Passivhaus Association
Tiered auditorium with green seating and exposed CLT walls and ceiling

savings

Good for the planet and the budget

Timber replaces much of the concrete and steel a school would normally use, cutting embodied carbon. The CLT panels also form the airtight layer, so large areas need no extra membranes. Fewer layers means less risk and simpler quality checks.

600 t

of CO₂ (approx.) locked inside the timber for the life of the building

[ ]%

less heating and cooling energy than a typical school building

[ ]

extra build cost compared with a conventional building

Architect quote

[Why timber and Passivhaus are the right choice for schools.]
[Name, Title], betti und knut architecture
Hoskins Building · 08  |  Photo: [Photographer] Australian Passivhaus Association

lessons

Four things every school should know

  1. 1

    Start early. Bring in an architect with Passivhaus experience from day one.

  2. 2

    Pick the right team. People who know mass timber make it simple.

  3. 3

    Plan the whole program. Line up trades to make the most of a fast timber build.

  4. 4

    Be open to new methods. Prefabrication makes building easier, not harder.

School quote 2 · via architect

“[Advice to other schools thinking about Passivhaus.]”
[Name, Title], The Illawarra Grammar School

Planning a new school building?

Talk to the Australian Passivhaus Association. We can connect you with experienced designers and builders.

passivhausassociation.com.au

Hoskins Building · 09
Entry atrium with exposed CLT stair and pendant lights
Australian Passivhaus Association

gallery

Recognition

A building worth celebrating

Photo needed

Project team with the award

School, architect and builder together at the award presentation. High resolution, landscape.

[Caption: names left to right, award name, event, year]

Students learning in a classroom

[Caption]

CLT panels being craned into place

[Caption]

Detail: sealing a panel joint or window

[Caption]

Official opening, May 2026

[Caption]
Hoskins Building · 10  |  Photos: [Photographer] Australian Passivhaus Association

at a glance

Project at a glance

The team

ClientThe Illawarra Grammar School
Architectbetti und knut architecture
Head contractor[ ]
Passivhaus consultant[ ]
Certifier[ ]
Structural engineer[ ]
Services engineer[ ]
CLT supplierKLH [confirm]
Timber installer[ ]
Photographer[ ]

The building

OpenedMay 2026
Floor area[ ] m²
Spaces[Short list]
Certification[Class, date]

Performance

Heating demand[ ] kWh/m²a
Cooling demand[ ] kWh/m²a
Primary energy (PER)[ ] kWh/m²a
Airtightness0.15 ACH [basis]

Key systems

Ventilation[MVHR make, model]
Windows[Make, glazing]
ShadingHeka Hoods [confirm]

Floor plan or section

Awards

[Award name] · [Body, year]
[Award name] · [Body, year]
[Award name] · [Body, year]